Line 3, Xi'an Metro
| Line 3, Xi'an Metro | |||
|---|---|---|---|
|
| |||
| Overview | |||
| Native name | 西安地铁三号线 | ||
| Type | Rapid Transit | ||
| System | Xi'an Metro | ||
| Status | Operational | ||
| Locale | Xi'an, Shaanxi, China | ||
| Termini |
Yuhuazhai [1] Baoshuiqu [1] | ||
| Stations | 26 [1] | ||
| Services | 1 | ||
| Daily ridership | N/A | ||
| Color on map | Purple [2] | ||
| Website | Xi'an Metro | ||
| Operation | |||
| Opened | November 8th, 2016 | ||
| Owner | Xi'an Metro Ltd | ||
| Operator(s) | Xi'an Metro Ltd | ||
| Character | Underground and overground | ||
| Depot(s) |
Yuhuazhai Depot and Guoji Gangwuqu Depot [1] | ||
| Rolling stock | CNR DKZ17 | ||
| Technical | |||
| Line length |
39.15 km (Phase 1) 50.5 km (After completion of Phase 2) | ||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
| Electrification | 1500 V DC Overhead catenary [3] | ||
| Operating speed | 80 km/h (50 mph) | ||
| |||
Line 3 of Xi'an Metro (Chinese:西安地铁三号线; pinyin:Xī'ān dìtiě sānhàoxiàn) is a rapid transit line running from northeast to southwest Xi'an, linking Xi'an International Trade & Logistics Park in the northwest through Xi'an Economic & Technological Development Zone to Yuhuazhai in the southwest. Line 3 is one of the three lines that form the main framework of Xi'an metro.[1] Phase 1 of Line 3 was opened on November 8th, 2016, with 19 underground stations and 7 overground stations. Phase 2 is still under construction. The line has purple as its color label,[2] as distinct from red of Line 2, and blue of Line 1.
Stations (from south to north)
| Station Number | Station Name (Chinese with transliteration) |
Station Name
(Unofficial English translation)[nb 1] |
Transfer | District | Phase |
|---|---|---|---|---|---|
| 301 | 鱼化寨站 Yuhuazhai Zhan |
None Planned | Yanta District | Phase 1 | |
| 302 | 丈八北路站
Zhangbabei Lu Zhan |
North Zhangba Road Station | |||
| 303 | 延平门站
Yanpingmen Zhan |
Line 8
(due 2021) | |||
| 304 | 科技路站
Keji Lu Zhan |
Keji Road Station | Line 6
(due 2019) | ||
| 305 | 太白南路站
Taibai Nanlu Zhan |
South Taibai Road Station | None Planned | ||
| 306 | 吉祥村站
Jixiangcun Zhan |
||||
| 307 | 小寨站
Xiaozhai Zhan |
Line 2 | |||
| 308 | 大雁塔站
Dayanta Zhan |
Giant Wild Goose Pagoda Station | Line 4
(due 2018) | ||
| 309 | 北池头站
Beichitou Zhan |
None Planned | |||
| 310 | 青龙寺站
Qinglongsi Zhan |
Azure Dragon Temple Station | |||
| 311 | 延兴门站
Yanxingmen Zhan |
Beilin District | |||
| 312 | 咸宁路站
Xianning Lu Zhan |
Xianning Road Station | Line 6
(due 2019) |
Xincheng and | |
| 313 | 长乐公园站
Changle Gongyuan Zhan |
Changle Park Station | None Planned | Xincheng District | |
| 314 | 通化门站
Tonghuamen Zhan |
Line 1 | |||
| 315 | 胡家庙站
Hujiamiao Zhan |
None Planned | |||
| 316 | 石家街站
Shijiajie Zhan |
||||
| 317 | 辛家庙站
Xinjiamiao Zhan |
Weiyang District | |||
| 318 | 广泰门站
Guangtaimen Zhan |
Line 8
(due 2021) | |||
| 319 | 桃花潭站
Taohuatan Zhan |
None Planned | Baqiao District | ||
| 320 | 浐灞中心站
Chanba Zhongxin Zhan |
Chanba Central Station | |||
| 321 | 香胡湾站
Xianghuwan Zhan |
||||
| 322 | 务庄站
Wuzhuang Zhan |
||||
| 323 | 国际港务区站
Guoji Gangwuqu Zhan |
Xi'an International Trade & Logistics Park Station | |||
| 324 | 双寨站
Shuangzhai Zhan |
||||
| 325 | 新筑站
Xinzhu Zhan |
||||
| 326 | 保税区站
Baoshuiqu Zhan |
Tax-free Zone Station | |||
Phase 2
Phase 2 of Xi'an Metro Line 3 is still in long-term planning [1](to be completed by year 2040), it will be an extension from the southwest terminus of Phase 1, Yuhuazhai Station to (tentatively named) Kunmingchi Station. After the completion of Phase 2, Line 3 will have 30 stations (an addition of 4 to Phase 1) and a length of 50.5 km in total.[1]
Rolling Stock
The rolling stock consists solely of CNR DKZ17 trains manufactured by CNR Dalian, 41 trainsets will be provided as per the first contract.[4] The trains run in six-car formation, with four motor cars and two trailer cars, which is different from previous trains (running in 3-3 formation), as more power is required to drive the trains up the ramp from underground to overground sections.[4]
| DKZ17 | |
|---|---|
| Manufacturer | CNR |
| Built at | CNR Dalian, CNR Changchun and CSR Sifang[4] |
| Formation |
Six-car formation Tc-Mp-M-T-Mp-Tc[nb 2] |
| Capacity | 1468(rated) 1880(maximum) |
| Operator(s) | Xi'an Metro |
| Specifications | |
| Train length | 19000 mm |
| Width | 2800 mm |
| Height | 3800 mm |
| Electric system(s) | 1500 V DC Overhead catenary |
Train Control
Line 3, as all the previous lines, uses Trainguard MT CBTC signal system manufactured by Siemens[5][6] to enhance the safety of the automated, driverless trains.
Notes
References
- 1 2 3 4 5 6 7 "西安地铁三号线一期工程" (in Chinese). 26 August 2013.
- 1 2 "西安地铁三号线列车线路识别色定为紫色" (in Chinese). 31 January 2015.
- ↑ "西安地铁三号线高架段供电系统工程正式开工". sn.people.com.cn (in Chinese). 17 March 2015. Retrieved 6 November 2015.
- 1 2 3 "西安地铁3号线首批列车到西安 腰线是粉色". 31 August 2015. Retrieved 6 November 2015.
- ↑ "Trainguard MT" (PDF). mobility.siemens.com. Siemens. p. 11. Retrieved 6 November 2015.
- ↑ "Communication Based Train Control System for Xi'an Metro Line 2". Baidu Documents. Retrieved 6 November 2015.
