List of HVDC links in Lithuania
List of HVDC links in Lithuania than 330 kV and/or the 400 kV-grid in Lithuania.
The list does not include smaller voltages like 110 kv or less links. Lithuania has 13 international 110 kv voltage links: 7 with Belarus, 3 with Russia and 3 with Latvia.
International links
| Name | Converter station 1 |
Converter station 2 |
Total Length (km) | Volt (kV) | Power (MW) | Year | Remarks |
|---|---|---|---|---|---|---|---|
| HVDC Alytus–Grodno | Alytus | | 330 kv | ||||
| HVDC Jurbarkas–Sovetsk | Jurbarkas | | 330 kv | ||||
| HVDC Klaipėda–Grobiņa | Klaipėda | | 330 kv | 1977 | |||
| HVDC Klaipėda–Sovetsk | Klaipėda | | 330 kv | ||||
| HVDC Kruonis–Sovetsk | Kruonis PSP | | 330 kv | ||||
| HVDC Panevėžys–Aizkraukle | Panevėžys | | 330 kv | 1970 | Connected to Plavinas HPS | ||
| HVDC Šiauliai–Jelgava | Šiauliai | | 330 kv | 1962 | Include additional link Mūša-Telšiai | ||
| HVDC Vilnius–Maladzyechna | Vilnius | | 330 kv | Planned to be dismissed by 2018[1] | |||
| HVDC Visaginas–Līksna | Visaginas | | 330 kv | ||||
| HVDC Visaginas–Minsk | Visaginas | | 330 kv | Connection between Ignalina NPP and Minsk CHP-5 | |||
| HVDC Visaginas–Polock | Visaginas | | 330 kv | ||||
| HVDC Visaginas–Smorgon | Visaginas | | 330 kv | ||||
| LitPol Link | Alytus | | 341 km | 330 kv, 400 kv | 500 MW | 2015 | |
| LitPol Link 2 | Marijampolė | | 330 kv, 400 kv | 500 MW | TBA | Planned second link between countries.[2] | |
| NordBalt | Klaipėda | | 450 km | 330 kv, 400 kv | 700 MW | 2015 |
Local links
| Name | Converter station 1 |
Converter station 2 |
Total Length (km) | Volt (kV) | Power (MW) | Year | Remarks |
|---|---|---|---|---|---|---|---|
| HVDC Klaipėda–Telšiai | Klaipėda | Telšiai | 89 km | 330 kv | 900 MW | 2014 | [3] |
| HVDC Kruonis–Jurbarkas | Kruonis | Jurbarkas | 330 kv | Connected to Kruonis Pumped Storage Plant. | |||
| HVDC Kruonis–Šiauliai | Kruonis | Šiauliai | 330 kv | Connected to Kruonis Pumped Storage Plant. | |||
| HVDC Lietuvos elektrinė – Alytus | Elektrėnai | Alytus | 330 kv | Connected to Elektrėnai Power Plant. | |||
| HVDC Lietuvos elektrinė – Panevėžys | Elektrėnai | Panevėžys | 330 kv | Connected to Elektrėnai Power Plant. | |||
| HVDC Lietuvos elektrinė – Kruonis | Elektrėnai | Kruonis | 330 kv | Connection between Elektrėnai Power Plant and Kruonis Pumped Storage Plant. | |||
| HVDC Lietuvos elektrinė – Visaginas | Elektrėnai | Visaginas | 330 kv | Connection between Elektrėnai Power Plant and Ignalina Nuclear Power Plant. | |||
| HVDC Lietuvos elektrinė – Vilnius | Elektrėnai | Vilnius | 330 kv | Connected to Elektrėnai Power Plant. | |||
| HVDC Visaginas–Panevėžys | Visaginas | Panevėžys | 330 kv | Connected to Ignalina Nuclear Power Plant. |
Proposed local links
| Name | Converter station 1 |
Converter station 2 |
Total Length (km) | Volt (kV) | Power (MW) | Year | Remarks |
|---|---|---|---|---|---|---|---|
| HVDC Kruonis–Alytus | Kruonis | Alytus | 330 kv | Connected to Kruonis Pumped Storage Plant. | |||
| HVDC Kruonis–Visaginas | Kruonis | Visaginas | 330 kv | ||||
| HVDC Panevėžys–Mūša | Panevėžys | Mūša | 330 kv | ||||
| HVDC Vilnius–Neris | Vilnius | Neris Station | 330 kv |