List of power stations in Nevada
The following page lists power stations in the U.S. state of Nevada.
Fossil fuel
Coal
| Name | Location | Type | Capacity (MW) | Status | Year Opened |
|---|---|---|---|---|---|
| TS Power Plant[1] | 40°45′7″N 116°30′56″W / 40.75194°N 116.51556°W | Coal | 242[2] | Operational | 2008 |
| Reid Gardner Generating Station | 36°39′25″N 114°38′02″W / 36.657°N 114.634°W | Coal | 577 | Operational | 1965 |
| North Valmy Generating Station | 40°52′48″N 117°8′54″W / 40.88000°N 117.14833°W | Coal | 522 | Operational | 1981 |
This list is incomplete; you can help by expanding it.
Natural gas
| Name | Type | Capacity (MW) | Status |
|---|---|---|---|
| Chuck Lenzie Generating Station | gas | 1,102 | operational |
| Clark Mountain Combustion Turbines | gas | 132 | operational |
| Edward W. Clark Generating Station | gas | 1,103 | operational |
| Fort Churchill Generating Station | gas | 226 | operational |
| Frank A. Tracy Generating Station | gas | 889 | operational |
| Harry Allen Generating Station | gas | 628 | operational |
| Silverhawk Generating Station | gas | 390 | operational |
| Walter M. Higgins Generating Station | gas | 530 | operational |
Renewable
Solar
| Name | Location | Type | Capacity (MW) | Status | Operator | Power Purchase Agreement with | Year opened |
|---|---|---|---|---|---|---|---|
| Aiya Solar | Moapa River Indian Reservation | Photovoltaic | 100[3] | Proposed | |||
| Apex Nevada Solar | North Las Vegas, Nevada | Photovoltaic | 20[4] | Operational | SunEdison[5] | NV Energy | 2012[6] |
| Boulder Solar | Boulder City, Nevada | Photovoltaic | 100[7] | Proposed | NV Energy | ||
| California Ridge Solar Project | Clark County, Nevada | Photovoltaic | 200[8] | Proposed | |||
| Copper Mountain Solar Facility | Boulder City, Nevada | Photovoltaic | 458[9] | Operational | Pacific Gas & Electric, Southern California Public Power Authority | ||
| Crescent Dunes Solar Energy Project | Nye County, Nevada | Concentrating Solar Power (molten salt) | 110[10] | Operational[11] | Tonopah Solar Energy, LLC (subsidiary of SolarReserve) | NV Energy | September 2015 |
| Dry Lake Solar Energy Center | Clark County, Nevada | Photovoltaic | 110[12] | Proposed | |||
| Edward W. Clark | Whitney, Nevada | Concentrating Solar Power | 0.075[13] | Operational | |||
| El Dorado Solar Power Plant | Boulder City, Nevada | Photovoltaic | 10[14] | Operational | Pacific Gas & Electric | 2008 | |
| Fort Churchill Solar Project | Mason Valley, Nevada | Photovoltaic | 19.9[15] | Under construction | |||
| Harry Allen Solar Energy Center | Clark County, Nevada | Photovoltaic | 130[16] | Proposed | |||
| K-Road | Clark County, Nevada | Photovoltaic | 250[17] | Under construction | |||
| Lago Seco Solar Project | Clark County, Nevada | Photovoltaic | 120[18] | Proposed | |||
| Las Vegas Valley Water District (6 projects) | Photovoltaic | 3[19] | Operational | 2006, 2007 | |||
| Meadow Valley Solar Project | Clark County, Nevada | Photovoltaic | 200[20] | Proposed | |||
| Mesa Solar Energy Project | Clark County, Nevada | Photovoltaic | 200[21] | Proposed | |||
| Moapa Solar | Clark County, Nevada | Photovoltaic (Concentrating Solar Power alternative under consideration)[22] | 200[23] | Proposed | |||
| Mountain View Solar | North Las Vegas, Nevada | Photovoltaic | 20[24] | Operational | NextEra Energy Resources | NV Energy | January 2014[25] |
| NV Dry Lake (Playa Solar) | Clark County, Nevada | Photovoltaic | 200[26] | Proposed | |||
| Nellis AFB Solar Star | Clark County, Nevada | Photovoltaic | 14[27] | Operational | U. S. Air Force (Nellis Air Force Base) | December 17, 2007 | |
| Nellis AFB Solar Array II | Clark County, Nevada | Photovoltaic | 15[28] | Proposed | U. S. Air Force (Nellis Air Force Base) | ||
| Nevada Solar One | Boulder City, Nevada | Concentrating Solar Power | 64[29] | Operational | Acciona Solar Power[30] | June 2007 | |
| River Mountains Solar | Photovoltaic | 14.4[31] | Proposed | ||||
| Searchlight Solar | Searchlight, Nevada | Photovoltaic | 17.5[32] | Operational | December 16, 2014[33] | ||
| Silver State North Solar Project | Primm, Nevada | Photovoltaic | 60[34] | Operational | May 7, 2012 | ||
| Silver State South Solar Project | Clark County, Nevada | Photovoltaic | 250[35] | Under construction | NextEra Energy Resources | Southern California Edison | |
| Snow Mountain Solar Project | Clark County, Nevada | Photovoltaic | 100[36] | Proposed | |||
| Spectrum Nevada Solar | Clark County, Nevada | Photovoltaic | 30[37] | Operational | 2013 | ||
| Stillwater GeoSolar Hybrid Plant[38] | Fallon, Nevada | Photovoltaic | 26 | Operational | Enel Green Power | NV Energy | |
| Stillwater GeoSolar Hybrid Plant[39] | Fallon, Nevada | Concentrating Solar Power | 2 | Operational | Enel Green Power | NV Energy | 2015 |
| Sunshine Valley Solar Project | Nye County, Nevada | Photovoltaic | 110[40] | Proposed | |||
| Switch Station | 100[41] | Proposed | |||||
| Taba Generating Station | 200[42] | Proposed | |||||
| Techren Solar | Photovoltaic | 180[43] | Proposed | ||||
| Toquop Energy Project | Lincoln County, Nevada | Photovoltaic | 100[44] | ||||
| Townsite Solar | Photovoltaic | 180[45] | Proposed | ||||
This list is incomplete; you can help by expanding it.
Geothermal
The following table contains information on geothermal plants located in Nevada:[46]
| Name | Location | Type | Capacity (MW) | Operator | Year opened |
|---|---|---|---|---|---|
| Beowawe | Whirlwind Valley, Nevada | Double Flash | 18 | Beowawe Power LLC | 1985 |
| Beowawe 2 | Whirlwind Valley, Nevada | Binary | 1.9 | Terra-Gen Power | 2011 |
| Brady Hot Springs | Churchill County, Nevada | Double Flash | 26.1 | Ormat | 1992 |
| Desert Peak | Churchill County, Nevada | Binary | 11 | Ormat | 2006 |
| Dixie Valley | Dixie Valley, Nevada | Double Flash | 64 | Terra-Gen Operating Co. | 1988 |
| Dixie Valley 2 | Churchill County, Nevada | Binary | 6.2 | Terra-Gen Power | 2012 |
| Don Cambell 1 | Mineral County, Nevada | Binary | 20 | Ormat | 2013 |
| Don Cambell 2 | Mineral County, Nevada | Binary | 20 | Ormat | 2015 |
| Faulkner/Blue Mountain | Humboldt County, Nevada | Binary | 50 | AltaRock Energy | 2009 |
| Florida Canyon Mine | Pershing, Nevada | Binary | 0.1 | ElectraTherm | 2012 |
| Galena II | Reno, Nevada | Binary | 15 | Ormat | 2007 |
| Galena III | Reno, Nevada | Binary | 30 | Ormat | 2008 |
| Jersey Valley | Reno, Nevada | Binary | 15 | Ormat | 2010 |
| McGinness Hills 1 | Lander, Nevada | Binary | 48 | Ormat | 2012 |
| McGinness Hills 2 | Lander, Nevada | Binary | 48 | Ormat | 2015 |
| Patua | Fallon, Nevada | Binary | 21 | Cyrq | 2013 |
| Richard Burdett | Steamboat, Nevada | Binary | 27 | Ormat | 2005 |
| Salt Wells | Churchill County, Nevada | Binary | 18.1 | Enel Green Power | 2009 |
| San Emidio (Empire) | San Emidio, Nevada | Binary | 4.8 | U.S. Geothermal | 1987 |
| San Emidio Repower | Washoe County, Nevada | Binary | 12.8 | U.S. Geothermal | 2012 |
| Soda Lake | Fallon, Nevada | Binary | 5.1 | Cyrq | 1987 |
| Soda Lake II | Fallon, Nevada | Binary | 18 | Cyrq | 1991 |
| Steam Boat I | Washoe County, Nevada | Binary | 8.4 | Ormat | 1986 |
| Steam Boat IA | Reno, Nevada | Binary | 2.4 | Ormat | 1988 |
| Steam Boat 2 | Reno, Nevada | Binary | 29 | Ormat | 1992 |
| Steam Boat 3 | Reno, Nevada | Binary | 24 | Ormat | 1992 |
| Steamboat Hills | Steamboat, Nevada | Single Flash | 14.4 | Ormat | 1988 |
| Stillwater | Fallon, Nevada | Binary | 47.3 | Enel NA | 2009 |
| Tuscarora | Elko, Nevada | Binary | 18 | Ormat | 2012 |
| Wabuska I | Wabuska, Nevada | Binary | 1.1 | Home Stretch Geothermal | 1984 |
| Wabuska II | Wabuska, Nevada | Binary | 1.1 | Home Stretch Geothermal | 1987 |
Wind
| Name | Location | Type | Capacity (MW) | Operator | Year opened |
|---|---|---|---|---|---|
| Spring Valley Wind | White Pine County, Nevada | Onshore wind | 152 | NV Energy | 2012 |
See also
- Solar power in Nevada
- Wind power in Nevada
- List of wind farms in the United States
- Geothermal energy in the United States
References
- ↑ Newmont Corp. "TS Power Plant Wins Triple Crown". Retrieved 25 April 2014.
- ↑ Nevada Division Of Environmental Protection. "Fact Sheet" (PDF). Retrieved 25 April 2014.
- ↑ Aiya Solar Project. "About the Project".
- ↑ NV Energy (August 2015). "Renewable Energy Projects List" (PDF).
- ↑ Solar Power World (July 2, 2012). "20-MW Apex Solar Project is Sold Off".
- ↑ NV Energy. "Solar Projects".
- ↑ NV Energy (August 2015). "Renewable Energy Projects List" (PDF).
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ Copper Mountain Solar Facility
- ↑ SolarReserve. "Crescent Dunes".
- ↑ National Renewable Energy Laboratory (November 10, 2015). "Crescent Dunes Solar Energy Project".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ NV Energy. (PDF) https://www.nvenergy.com/company/energytopics/images/Clark_Fact_Sheet.pdf. Missing or empty
|title=(help) - ↑ El Dorado Solar Power Plant
- ↑ Reno Gazette-Journal (March 25, 2015). "SunPowers Large MV Solar Array Project Nearing Completion".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ NV Energy. "Solar Projects".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ Moapa Solar Energy Center. "About the Project".
- ↑ State of Nevada Public Utilities Commission. "Renewable Energy Projects Approved and or Permitted by the PUCN".
- ↑ NextEra Energy Resources. "Mountain View Solar Energy Center Fact Sheet" (PDF).
- ↑ NextEra Energy Resources. "Mountain View Solar Energy Center Fact Sheet" (PDF).
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ Nellis Solar Power Plant
- ↑ NV Energy. "Solar Projects".
- ↑ Nevada Solar One
- ↑ NV Energy. "Solar Projects".
- ↑ U. S. Energy Information Administration (September 2015). "Planned U. S. Electric Generating Unit Additions".
- ↑ NV Energy. "Solar Projects".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ Silver State North Solar Project
- ↑ First Solar (September 3, 2014). "Construction Begins on 250MW Silver State South Solar Project in Primm Nevada".
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ NV Energy. "Solar Projects".
- ↑
- ↑
- ↑ State of Nevada Public Utilities Commission (January 2015). "New and Proposed Generation Plants in Nevada".
- ↑ NV Energy. "NV Energy's Renewable Energy Sources" (PDF).
- ↑ NV Energy. "Solar Projects".
- ↑ State of Nevada Public Utilities Commission. "Renewable Energy Projects Approved and or Permitted by the PUCN".
- ↑ Toquop Energy Project
- ↑ State of Nevada Public Utilities Commission. "Renewable Energy Projects Approved and or Permitted by the PUCN".
- ↑ "Geothermal Power Plants - USA". Geothermal Energy Association. 2013. Retrieved 2013-05-29.
This article is issued from Wikipedia - version of the 9/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.