Newlincs EfW facility
| Newlincs EfW facility | |
|---|---|
![]() NewLincs EfW facility in 2008 | |
![]() Location of Newlincs EfW facility in Lincolnshire | |
| Official name | NewLincs EfW facility |
| Country | England |
| Location | Lincolnshire, Yorkshire and the Humber |
| Coordinates | 53°36′23″N 0°08′38″W / 53.6063°N 0.1439°WCoordinates: 53°36′23″N 0°08′38″W / 53.6063°N 0.1439°W |
| Commission date | 2004 |
| Operator(s) | NewLincs Developments Ltd |
| Thermal power station | |
| Primary fuel | Waste |
| grid reference TA229138 | |
The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]
See also
References
- ↑ Your Energy Your Waste, www.newlincs.com, Retrieved 22 February 2007
External links
| Wikimedia Commons has media related to Newlincs EfW facility. |
This article is issued from Wikipedia - version of the 3/22/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.



