Sungei Bedok MRT Station
DT37 TE31 Sungei Bedok 双溪勿洛 சுங்ஙை பிடோக் Sungei Bedok | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Rapid transit | ||||||||||||||||
| Line(s) | ||||||||||||||||
| Platforms | Island | |||||||||||||||
| Tracks | 6 (inclusive 1 siding per line to depot) | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Depth | 27m | |||||||||||||||
| Platform levels | 3 | |||||||||||||||
| Disabled access | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | DT37 TE31 | |||||||||||||||
| History | ||||||||||||||||
| Opened | 2024 | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| Location | ||||||||||||||||
![]() | ||||||||||||||||
Sungei Bedok MRT Station (DT37/TE31) is a future underground Mass Rapid Transit interchange and terminal station on the Downtown Line and Thomson-East Coast Line in Bedok planning area, Singapore.[1]
The station is named after Sungei Bedok, a small river within its vicinity.
History
This station was first announced on 15 August 2014.[2] Like the existing HarbourFront MRT Station, this future MRT station will serve as a terminal station for 2 lines.
Station layout
| L1 | Street Level | Eastwood Centre, Bedok Food Court |
| B1 | Concourse | Faregates, Ticketing Machines, Station Control, Transitlink Counter, Underground Bicycle Parking |
| B2 | ||
| Platform A | Thomson-East Coast Line (future service) towards TE1 Woodlands North via TE30 Bedok South (←) | |
| Platform B | Thomson-East Coast Line (future service) towards TE1 Woodlands North via TE30 Bedok South (←) | |
| B3 | Platform C | Downtown Line (future service) towards DT1 BP6 Bukit Panjang via DT36 Xilin (→) |
| Platform D | Downtown Line (future service) towards DT1 BP6 Bukit Panjang via DT36 Xilin (→) | |
Transport connections
| Destination | First Train | Last Train | ||||
|---|---|---|---|---|---|---|
| Mon – Sat | Sunday & Public Holiday | Daily | ||||
| Downtown Line | ||||||
| to DT1 Bukit Panjang | – | – | – | |||
| Thomson-East Coast Line | ||||||
| to TE1 Woodlands North | – | – | – | |||
References
- ↑ "Stages of Thomson-East Coast Line". Land Transport Authority. 15 August 2014.
- ↑ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links In The East". Land Transport Authority. 15 August 2014.
This article is issued from Wikipedia - version of the 11/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.
